Design 3: target 20 lpm (14.5.2021-)
Design 3: target 20 lpm (14.5.2021-) Read More »
The design was updated to a smaller system with rapidly switching. The design change was made considering the availability of the compressors
Fixed leaks, updated design (1.5.2021) Read More »
Started characterizing the Molecular Sieves.
Quality of 13X source, checking leaks (29.04.2021) Read More »